Product Detail :
|
Part supply of telecom materials, installation, testing and commissioning in connection with the work of (1) permanent shifting of ofc at 383/24-26 km due to rfo construction work in prtn -plj section(mpr-vrm subsection). (2) proposed construction of rail flyover of span 1x71x+1x17.607m at dfcc ch63.079 crossing ir track at km 312/14-18 between sanjali and ankleshwar stations on st-brc (bg) section of vadodara division i.c.w wdfc (phase ii) special steel bridge works contract package-15a, (icb no. ctp-15a) between jnpt to dadri shifting of utility like s&t cables and ohe pole no. 312/15-16.
|